
Projects
Fabrication and Installation Of Well 9SS Sand Trap, Benin

This project was done by ETS BY FORCE THREE for CAP OIL in the year 2022 at community Bayelsa State. CAP OIL identified that wellhead 9SS at community produces too much sand alongside crude oil which was destroying their fittings and equipment at the flow station and gas plant, in order to address the issue, ETS BY FORCE THREE was called upon for solutions to minimize the amount of sand coming out of the well.
ETS BY FORCE THREE came up with the solution to the problem, which is to fabricate and install a sand trap at the well to trap the sand coming out of the well before it goes to the flow station and gas plant.
Other Projects